Drilling of exploitative and exploratory wells to a depth of up to 4.5 thous. m.;
Drilling of sidetracks, directional wells and shafts;
Drilling of water wells;
Modernization of the existing scheme for the collection and preparation of hydrocarbons;
Geological exploration of oil and gas wells.
Project, manufacture and installation of commercial gas metering stations;
Project and construction of internal and external engineering networks of buildings
Laying of engineering networks of trails as the traditional open method, and closed method;
Construction of modular boilers;
Surveys of gas supply systems, heating and water supply.