Spetsgazprom, Zaporozhye Production Plant

  • Address:
    6, Artema str., c. Zaporizhzhya, 69000, Ukraine
  • Telephone:
    +38(061) 284-90-96
General Director - Pavlo Kravchenko

Burner SIS it is:
- possibility copper working at full loading at low pressure gas (to 500 mm. in st.) and average pressure (to 2500 mm. in st.);
- reduction of specific costs gas for copper from 5 to 15% (for oven well more) ;
- reduction of costs electric power from 20% to 50% ;
- conformity present-day ecological standard;
- burner safety (kindle with pressure to 5 mm. in st.) ;
- adaptation to relevant automatic object;
- operative range power control enlargement (from 10% to 130%);
- possibility block execution (gas fitting, automatic control unit regulation and safety, ventilators) to realization present-day task automation gas-fired plant and objec on the whole;
-payout modernization objec to one year.